Rubber Moulding in India: Compound, Mould, Cure, Inspect

How does Margo mould a rubber part?

Margo Rubber Products mixes its own compound, makes its own moulds and produces rubber parts as per your drawing by compression, transfer and injection moulding at one plant in Vilholi, Nashik. Every mixed batch is checked, every run is checked at set-up and every half hour, and every despatch lot is checked for dimensions and hardness before release. Quotation in 48 hours, production in three to four weeks.

01 · PROCESS

The six operations every part goes through

Our PPAP process flow MRP/PF/01 numbers the operations in tens. It was written for one part, an insulator bush, and other parts follow the same sequence.

The six operations of process flow MRP/PF/01
OpOperationWhat is checked
10Raw material receiptRubber and SRF carbon black: grade and visual, each lot. Chemicals: brand and shelf life, each lot
20Raw material inspectionMaterial is inspected before it is issued to production
30MouldingMixing: functional and weight check, every batch. Set-up: 2 pieces dimensionally approved. Run: dimensions every ½ hour, temperature and time every hour
40Deflashing and cleaningFlash removed, parts cleaned
50InspectionID, OD and thickness, and hardness, each lot
60PackingHDPE bags, labelled cartons; export packing on export lots

For that bush, MRP/PF/01 sets the mould temperature at 160 ± 10 °C. The figure belongs to that part. Your part gets its own setting on its own control plan.

02 · PROCESS

Custom compound, mixed in-house

Eight compounds are mixed in-house: EPDM, NBR, FKM, silicone, AEM, neoprene, SBR and natural rubber. A trader buys compound pre-mixed. We mix ours and keep the batch record.

Raw rubber, chemicals and SRF carbon black are booked in separately. Every mixed batch gets a functional and weight check, 100 % of batches. The ODR rheometer then runs the cure curve to ISO 6502-2, and the torque and scorch safety from that curve set the press cycle time.

If your drawing calls for a hardness, a temperature range or a fluid we don't already run, the compound is formulated for it. Compound batch, cure parameters and inspection results stay retrievable per production batch.

03 · PROCESS

Mould making and prototypes, in-house

The mould is designed and cut in our own toolroom, from a CAD file, a section drawing or a worn part in an envelope. No outside tool shop sits in the loop, so a revision takes days, not weeks.

  • Prototype: 48 to 72 hours from an approved drawing
  • Fitment samples: inside two weeks
  • Tooling cost: quoted upfront, then amortised into the piece price or credited against committed volume

04 · PROCESS

Moulding: compression, transfer or injection, chosen by the part

Compression moulding. A measured blank goes into the open cavity and the press closes on it. Tooling is simpler and cheaper to cut. It suits thick sections, larger parts and moderate volumes: pads, buffers, mounts, large gaskets.

Transfer moulding. Compound is forced from a pot through sprues into a closed mould. We use it for parts with metal inserts and where the flash has to be tighter than compression gives.

Injection moulding. Compound is injected into a closed, heated mould. Short cycles and repeatable fill suit high-volume small parts.

Rubber-to-metal bonding. Bushes, mounts and bonded seals are bonded in-house. Bond design and failure modes are in our rubber-to-metal bonded parts guide.

Sponge and foam. Moulded sponge and closed-cell foam parts run on the same presses.

Extrusion. Profiles, cords and tubing are made by continuous-cure extrusion, quoted to ISO 3302-1 class E1 to E3.

Presses hold cure temperature and pressure closed-loop. Two pieces are dimensionally approved at set-up before the run starts.

05 · PROCESS

Post-cure and finishing

Programmable electric ovens run post-cure where the compound needs it. Each batch keeps a record of cure time, temperature and pressure that we can pull up later. Flash comes off by cryogenic deflashing or by trimming on variable-speed grinder-cutters.

06 · PROCESS

Inspection and release

First article, then in-process checks through the run, then a final check on every despatch lot before it is released. Sampling follows an AQL table based on IS 2500.

In-house tests and the standards they follow
TestStandard
Hardness, Shore A durometerASTM D2240
Tensile strength and elongationASTM D412 · ISO 37
Compression setASTM D395 · ISO 815-1
Cure curve, ODR rheometerISO 6502-2
Heat ageing, hot-air oven to 200 °CASTM D573 · ISO 188
Specific gravityASTM D297 · ISO 2781
Dimensions, verniers and micrometers to ±0.01 mmISO 3302-1

Ozone, abrasion, tear, rebound, low-temperature brittleness, fluid immersion and flammability tests go to NABL-accredited partner laboratories on request. Supplier calibration certificates are reviewed against a 13-point checklist. APQP and PPAP where your programme requires them.

07 · PROCESS

Lead times and minimum order

Lead times by stage
StageTime
Quotation and feasibility report48 hours
Prototype, from an approved drawing48 to 72 hours
Production, existing tooling3 to 4 weeks ex-works Nashik; 2 weeks express where capacity is confirmed
New tooling3 to 4 weeks plus tooling time

Minimum run is 10,000 pieces per part number, per compound. Prototype and first-article lots sit outside the minimum and are quoted separately. Installed capacity is five million components a month.

08 · PROCESS

What the certificate covers

ISO 9001:2015, certificate 09111526A, Integral Certification Ltd, valid to 21 February 2027. Scope: rubber moulded components. The scope extension to the extruded and cellular lines is in hand. IATF 16949 is not held; the upgrade is in progress.

09 · PROCESS

Send a drawing

Send the drawing or a sample, the compound or the service conditions (medium, temperature, pressure) and the annual volume. You get a quotation and feasibility report within 48 hours.