
Rubber Parts Supplier for Tier 2 Automotive Suppliers
If you build sub-assemblies, harnesses, lamps, moulded plastics or metal parts for a Tier 1 or a vehicle maker, the rubber inside them can come from one plant in Nashik, made to your drawing, in the volumes your programme runs at.
- 5 million parts a month installed
- 10,000-piece runs
- Quote in 48 hours
Margo Rubber Products supplies Tier 2 and Tier 1 automotive suppliers with rubber bushes, oil seals, O-rings, grommets, pads, stoppers, boots and extruded profiles, moulded to drawing at its ISO 9001:2015 certified plant in Nashik. Installed capacity is 5 million parts a month against about 1.5 million in production. Minimum run 10,000 pieces per part number, per compound. Quotation in 48 hours; production in three to four weeks.
WHAT TIER 2 SUPPLIERS BUY FROM US
The rubber inside your assembly.
One supplier for the rubber content of a sub-assembly, so a lamp, harness or bracket programme is not waiting on five different moulders.

01
Rubber bushes & silent blocks
Silent-block, insulation, linkage and cushion bushes, bore and OD to drawing.
View product
02
Rubber oil seals
Shaft seals in DIN 3760 and ISO 6194 sizes, single and double lip.
View product
03
O-rings
AS568, ISO 3601, JIS B2401 and DIN 3771 sizes, or cut to your drawing.
View product
04
Wiring harness grommets
Open, blind, multi-hole and oval grommets for harness and firewall pass-throughs.
View product
05
Pads, stoppers & caps
Support pads, glove-box stoppers, filler caps and shroud flaps to drawing.
View product
06
Rubber profiles & cords
Door, hatch and channel seals and solid cords extruded to a profile drawing.
View product
WHY TIER 2 BUYERS USE US
Capacity, control and speed.
A Tier 2 supplier carries the Tier 1's delivery and quality demands. These are the numbers we hold ourselves to.
Volume and spare capacity
Installed capacity is 5 million parts a month against about 1.5 million in current production. The minimum run is 10,000 pieces per part number, per compound.
Checked through the run
Every mixed batch is checked, every run at set-up and every half hour, and every despatch lot for dimensions and hardness. Target rejection is under 1%; on-time delivery is over 99%.
Tooling in-house
Moulds are cut in our own tool room, so a new part or a drawing change does not wait on an outside toolmaker.
Compounds mixed in-house
We mix our own compound in eight bases, including AEM, NBR, EPDM, FKM, silicone and natural rubber, and check every mixed batch.
| What you need | What we hold to |
|---|---|
| Quotation | Within 48 hours of the drawing |
| Production lead time | Three to four weeks from drawing approval |
| Minimum run | 10,000 pieces per part number, per compound |
| Capacity | 5 million parts a month installed, about 1.5 million in use |
| Rejection target | Under 1% |
| On-time delivery | Over 99% |
WHO WE SUPPLY
Vehicle makers and the suppliers behind them.
Plastic moulders
Rubber seals, grommets and buffers that go into moulded lamp, trim and interior assemblies.
Metal and fabrication shops
Bushes, pads and bonded parts for brackets, mounts and chassis sub-assemblies.
Harness makers
Harness, firewall and connector grommets moulded to the harness drawing.
Vehicle makers
Automotive customers include Mahindra & Mahindra, Tata and Hyundai, alongside component suppliers such as Satish Injecto-Plast, Abhijeet Plastics (India) and Ukay Metal Industries.
FREQUENTLY ASKED QUESTIONS
Questions from automotive buyers.
Do you supply Tier 2 automotive suppliers directly?
Yes. Tier 2 component suppliers already buy from us directly. Automotive customers include Mahindra & Mahindra, Tata and Hyundai, alongside component suppliers such as Satish Injecto-Plast, Abhijeet Plastics (India) and Ukay Metal Industries. We quote within 48 hours of a drawing.
How much capacity do you have for a new automotive programme?
Installed capacity is 5 million parts a month against about 1.5 million in current production, so a new programme has room. The minimum run is 10,000 pieces per part number, per compound, and production takes three to four weeks from drawing approval.
What documents come with each automotive shipment?
Every component is produced against a controlled drawing revision, with first-article approval before volume release. Each shipment carries batch records and material certificates, and the drawing revision is recorded on the despatch documentation.
Are you IATF 16949 certified?
We hold ISO 9001:2015, certificate 09111526A, issued by Integral Certification Ltd, and are upgrading our quality management system to IATF 16949:2016, targeting certification by the end of 2026. Tier 2 buyers already receive drawing-controlled production, first-article approval and batch traceability.
MORE FOR AUTOMOTIVE BUYERS
Automotive rubber parts by part and location
Send us the rubber content of your next programme.
Drawings or samples, compounds if specified, and annual volumes. We reply within 48 hours with compound recommendations, tooling and a quotation.
